{"id":11753,"date":"2021-12-31T14:19:20","date_gmt":"2021-12-31T12:19:20","guid":{"rendered":"https:\/\/caa.rks-gov.net\/?p=11753"},"modified":"2021-12-31T14:19:20","modified_gmt":"2021-12-31T12:19:20","slug":"aeroporti-nderkombetar-i-prishtines-adem-jashari-pajiset-me-certifikaten-e-operimit-te-aerodromit-per-aeroplane-me-te-medhenj-kategoria-icao-code-e-dhe-sistem-te","status":"publish","type":"post","link":"https:\/\/caa.rks-gov.net\/en\/aeroporti-nderkombetar-i-prishtines-adem-jashari-pajiset-me-certifikaten-e-operimit-te-aerodromit-per-aeroplane-me-te-medhenj-kategoria-icao-code-e-dhe-sistem-te\/","title":{"rendered":"Aeroporti Nd\u00ebrkomb\u00ebtar i Prishtin\u00ebs \u201cAdem Jashari\u201d pajiset me certifikat\u00ebn e operimit t\u00eb aerodromit p\u00ebr aeroplan\u00eb m\u00eb t\u00eb m\u00ebdhenj &#8211; kategoria \u201cICAO Code E\u201d, dhe sistem t\u00eb aterrimit preciz kategoria \u201cILS Cat. III b\u201d n\u00eb pist\u00ebn 17"},"content":{"rendered":"\n<p>N\u00eb k\u00ebt\u00eb fundvit gjat\u00eb procesit t\u00eb finalizimit t\u00eb projektit t\u00eb zgjatjes s\u00eb pist\u00ebs nga 2.500 n\u00eb 3.040 metra bashk\u00eb me infrastruktur\u00ebn p\u00ebrcjell\u00ebse, operatori i aerodromit n\u00eb Aeroportin Nd\u00ebrkomb\u00ebtar t\u00eb Prishtin\u00ebs \u201cAdem Jashari\u201d u pajis nga Autoriteti i Aviacionit Civil t\u00eb Kosov\u00ebs edhe me certifikat\u00ebn e operimit t\u00eb aerodromit p\u00ebr aeroplan\u00eb t\u00eb kategoris\u00eb m\u00eb t\u00eb lart\u00eb, dmth nga \u201cICAO Code 4C\u201d n\u00eb \u201cICAO Code 4E\u201d. Ndryshimi i certifikat\u00ebs p\u00ebrfshin\u00eb poashtu edhe plot\u00ebsimin e kritereve p\u00ebr standardet p\u00ebrkat\u00ebse t\u00eb infrastruktur\u00ebs n\u00eb tok\u00eb p\u00ebr operim me sistemin preciz t\u00eb aterrimit \u201cILS Cat IIIb\u201d n\u00eb pist\u00ebn 17 (ana veriore) n\u00eb korrelacion me pajisjet p\u00ebrkat\u00ebse naviguese dhe plot\u00ebsimin e standardeve q\u00eb nd\u00ebrlidhen me navigimin ajror. &nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>N\u00eb projektin e zhvillimit t\u00eb infrastruktur\u00ebs s\u00eb aeroportit, p\u00ebrve\u00e7 zgjatjes s\u00eb pist\u00ebs nga 2.500 n\u00eb 3.040 metra, jan\u00eb p\u00ebrfshir\u00eb edhe dy rrug\u00eb t\u00eb reja p\u00ebr dalje t\u00eb shpejt\u00eb t\u00eb avion\u00ebve nga pista (\u201cRapid Exit Taxiway\u201d), instalimi i ndri\u00e7imit t\u00eb ri p\u00ebr navigim dhe at\u00eb mbrojt\u00ebs n\u00eb pist\u00eb me rrug\u00ebt dhe dritat e reja t\u00eb afrimit p\u00ebr aeroplan\u00ebt, pajisje t\u00eb komunikimit, stacioni p\u00ebr observim meterologjik, d.m.th. edhe&nbsp; &nbsp;modernizimi i nj\u00eb pjes\u00eb t\u00eb sistemit t\u00eb kontrollit t\u00eb ndri\u00e7imit dhe t\u00eb navigimit.<\/p>\n\n\n\n<p>Pas vler\u00ebsimit t\u00eb krejt procesit dhe rekomandimit nga departamenti i aerodromeve, drejtori i p\u00ebrgjithsh\u00ebm i AAC me 21 dhjetor 2021 l\u00ebshoi certifikat\u00ebn e aerodromit ku operatori autorizohet t\u00eb operoj\u00eb n\u00eb ANP \u201cAdem Jashari\u201d n\u00eb p\u00ebrputhje me dispozitat e rregullores Nr.17\/2017 (Rregullorja BE No. 193\/2014), baz\u00ebn e certifikimit t\u00eb aerodromit, kushtet e certificat\u00ebs dhe manualin e aerodromit.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"1600\" height=\"769\" src=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/2.jpg\" alt=\"\" data-id=\"11758\" data-link=\"https:\/\/caa.rks-gov.net\/?attachment_id=11758\" class=\"wp-image-11758\" srcset=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/2.jpg 1600w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/2-300x144.jpg 300w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/2-768x369.jpg 768w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/2-1536x738.jpg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"1600\" height=\"1200\" src=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/1-1.jpg\" alt=\"\" data-id=\"11761\" data-link=\"https:\/\/caa.rks-gov.net\/?attachment_id=11761\" class=\"wp-image-11761\" srcset=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/1-1.jpg 1600w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/1-1-300x225.jpg 300w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/1-1-768x576.jpg 768w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/1-1-1536x1152.jpg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"1600\" height=\"1066\" src=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/DSC_1178.jpg\" alt=\"\" data-id=\"11764\" data-full-url=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/DSC_1178.jpg\" data-link=\"https:\/\/caa.rks-gov.net\/?attachment_id=11764\" class=\"wp-image-11764\" srcset=\"https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/DSC_1178.jpg 1600w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/DSC_1178-300x200.jpg 300w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/DSC_1178-768x512.jpg 768w, https:\/\/caa.rks-gov.net\/wp-content\/uploads\/2021\/12\/DSC_1178-1536x1023.jpg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>N\u00eb k\u00ebt\u00eb fundvit gjat\u00eb procesit t\u00eb finalizimit t\u00eb projektit t\u00eb zgjatjes s\u00eb pist\u00ebs nga 2.500 n\u00eb 3.040 metra bashk\u00eb me&#8230;<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[18],"tags":[],"_links":{"self":[{"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/posts\/11753"}],"collection":[{"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/comments?post=11753"}],"version-history":[{"count":1,"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/posts\/11753\/revisions"}],"predecessor-version":[{"id":11767,"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/posts\/11753\/revisions\/11767"}],"wp:attachment":[{"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/media?parent=11753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/categories?post=11753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/caa.rks-gov.net\/en\/wp-json\/wp\/v2\/tags?post=11753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}